Dr
Shabir Choudhry 25 January 2017
Relationship between Pakistan and so called
Azad Kashmir is that of a master and a slave; or perhaps, more appropriately
relationship is that of an exploiter and exploited. Pakistani government and officials
systematically exploit both regions of Gilgit Baltistan and Azad Kashmir.
However, some mental slaves of Pakistan because of continuous one - sided propaganda
and because of excessive use of religion do not have consciousness of being
occupied or exploited.
Let me support this view point by a few
examples. Upper Jhelum Canal was constructed during the British Raj. The Punjab
government under the British Raj generously gave facilities to the Maharaja of
Jammu and Kashmir and his subjects, inhabitants of Jammu and Kashmir.
The Maharaja of Jammu and Kashmir received
royalty from the Punjab government up till 1947, because the Canal originates
from the River Jhelum and runs through the Jammu and Kashmir territory before
it enters Punjab territory near a place called Ali Baig. When the British Raj
ended on 15 August 1947, the so called big brother of Kashmiris emerged as an
independent country. Since that date we have not received anything as a
royalty. After that date we are systematically exploited and looted.
On 22 October 1947, in violation of a written
agreement Pakistani government managed a tribal attack which resulted in death
of tens of thousands of innocent men, women and children, rapes, kidnapping and
plunder. The attackers were told everything which is removable is yours and
everything else belonged to Pakistan, meaning land, buildings and natural
resources etc belonged to Pakistan.
From that day onwards there has been one way
traffic, exploitation, manipulation, looting and plunder of our resources by
Pakistan. Billions of Rupees worth property belonging to State of Jammu and
Kashmir was takeover by Pakistan, and to date we have not received any rent or
proceedings of these properties. In another article I have provided some
details of these properties. 1
Exploitation over Mangla Dam is very well
documented by many writers, and I have also written a number of articles on
this topic. In nutshell, Pakistan did not build Kala Bagh Dam in Pakistan to
meet water and energy requirements of Pakistan, but uprooted tens of thousands
of people of Mirpur and built Mangla Dam against our wishes. Thousands of
families were not paid any compensation and no proper arrangements were made to
settle these people. Innocent people were promised free electricity, but in
reality we pay more per unit than people of District Jhelum just a few miles
away.
The Dam was completed in 1967, and it’s all
costs were recovered after 5 years; but Azad Kashmir was not paid anything in
the form of royalty. We cannot use the water of the Dam; and we don’t have
sufficient drinking water. After the upraising of the Mangla Dam, it has
capacity to produce 1400 MW. There are other small and medium size projects
which take the current production of electricity to more than 1500 MW. If we
generously use electricity in Azad Kashmir, still our requirement is less than
350 MW.
Question arises why do we suffer from long
hours of load shedding when we produce five times more than our requirement? All
the electricity produced first goes to Pakistan, so called National Grid. From
there the Pakistani officials distribute electricity to various places; and we
know for sure that we are not on top of their list of priorities, hence up to
14 -16 hours load shedding in our region. If we complain or expose this we are
labelled as ‘anti Pakistan’ and in some cases ‘agents of India’ and other
countries.
Our just demand: we must have priority in use
of our electricity, water and other natural resources. Any surplus, Pakistan
should buy from us; and not exploit us like an imperial power.
There are many other means of exploitation and
I cannot include all the forms of exploitation in one article.2 Just take example of Neelam Jhelum Project. People
of Pakistan did not allow construction of Kala Bagh Dam even though it was to
benefit Pakistan. Pakistan is constructing Neelam Jhelum Dam near Muzaffarabad
against our wishes. Hundred percent benefits of this dam will go to Pakistan.
We will only suffer from environment problems; and to rub salt in our wounds
Pakistan is charging each household of Azad Kashmir around 20 Rs per month for
the construction of this dam.
If there were 300,000 households in Azad
Kashmir, and if we multiply that with 20 Rs per month, call it ‘Jaga tax or ‘Bhata
collection’ net income of Pakistan per month is 6.000,000. If this is
multiplied that with 12 months, net profit is: 72,000,000 per annum. Pakistan
has been looting this for many years. Those who complain against this or expose
this day light robbery, they are accused of being anti Pakistan and agents of
India. Mental slaves and foot soldiers of Pakistan choose to remain quiet because
they don’t want to be in the bad books of Pakistan and their agencies.
A friend who is in a position of some authority
has provided me some information and I want to share that readers. I will never
let this friend down. He is a true well wisher of the people of Jammu and
Kashmir; better than many people with hat of nationalism on their heads.
Below
is a list of projects in Azad Kashmir. Some of the projects are completed and
producing electricity; and others are under construction. There are only seven
projects which have not started and I have put potential against them. If we
had no other form of income, and we only relied on our water/ electricity resources
we can be many times better off than many countries in the world, including
Pakistan, which says Azad Kashmiri people will starve without help of Pakistan.
- Tahobat: 5 MW
- Janawahi: 5 MW
- Shontar: 20 MW
- Sharda 3 MW
- Gurnot 40
MW potential
- Dorain 14 MW potential
- Nagdar 5.4
MW
8.
Keel 0.2
MW
- Kundal shahi 2
MW
- Jagran 30 MW
- Jagran 2 45 MW potential
- Jagran 4 08 MW
- Madar Buldara
10.2 MW
- Riali 3 3.7 MW
- Jhing 1 14 MW potential
- Jhing 2 03 MW potential
- Riali 1 1.6 MW
- Riali 2 4.9 MW
- Pattika 0.2 MW
- Patrind 147 MW
- Rara 35 MW
- Neelam Jhelum 968 MW
- Harriola 12
MW
- Hoteri 5.4MW
- Kathai 3.2MW
- Kathai 2 5 MW
- Leepa 1.6 MW
- Chammfall: 6.5
MW
- Chinari 0.1MW
- Chakothi Hatian
139 MW
- Mahl 590 MW
- Hari Ghal 54 MW potential
- Qadirabad 3
MW
- Barar 1MW potential
- Rerah 1.5 MW
- Baltar 4.8
MW
- Azad Patan 650
MW
- Hajira 2
MW
- Pothi 0.2 MW potential
- Shera 130
MW
- Dakhari 2.2
MW
- Kotli 100
MW
- Sarhota 1
MW
- Sarsawa 07
MW
- Kotli Ban 1
MW
- Gulpur Kotli 100 MW
- Rajdhni 132 MW
- Dhanwan 1.5 MW
- Mangla 1400
MW
- New Bong 84 MW
- Jari 1 MW
- Samahni 1.6 MW
- Pathi 0.2 MW 3
Writer
is a political analyst, TV anchor and author of many books and booklets. Also
he is Chairman South Asia Watch and Director Institute of Kashmir Affairs. Email: drshabirchoudhry@gmail.com
References
2/http://drshabirchoudhry.blogspot.co.uk/2013/10/our-green-gold-exploited-by-pakistan-dr.html
3/Hydel
Power Projects Status (Azad Jammu and Kashmir of Pakistan)
Hydel
Power Resources of Pakistan– 2011
No comments:
Post a Comment